Benoit Bes

MPM10 (Montreal Metro) Rolling Stock Information Solution Project Manager, ALSTO

H4R 2N3MontréalQuebec - Canada

After an engineer graduation in 2001 from INSA, I found a position in ALSTOM Transport as validator.

Quickly I became an Automatic Train Control manager responsible of the design, production and revenue service of the Automatic Train Control for Incheon project (Seoul Airport Link) and Madrid project (Tramway).

At the same time, I was design authority for Urbalis 200 on-board Automatic Train Control product and ensure the coherence of U200 on-board Automatic Train Control development on several project : Daegu L2, Santiago L4, Delhi, Shanghai L4, Incheon and Madrid.

In 2007 I choose to continue my career as manager and took the position of interface manager and deputy of project manager in Istanbul for the Marmaray project.

During 2 years and a half, I lived in Istanbul close to our customer and giving support to on-shore project manager for activities coordination.

In december 2009 I came back to France to take the lead as off-shore project manager of the cost, quality and delay of Marmaray project.

Since March 2011, I have been based in Montreal, Canada, as project manager for the new Montreal Metro (MPM10)

35 contacts
Since 2011

Expatriate in Canada

Information Solution Project Manager for Metro project of Montreal (50M€). Rolling Stock project (ALSTOM/BOMBARDIER) for delivery of 52 new trains.

- Responsible for the quality, cost and delay of the passenger annoucement, passenger information, CCTV, Automatic Train control and Traction command systems.

- Coordination of all work packages (WPs) to optimise the QCD (quality, cost, delay) performance of the project.

- Contribution to the improvement of the gross margin of the overall roling stock project.

- Multi-site and multidisciplinary ressource management.

- Cost, risk and savings management.

- Additional clause negotiation and claims management with the customer.

Railways
Professional experience
2010 - 2011

Signaling Project Manager for Tramway project of Constantine (20Meuros). Project Turnkey (JV ALSTOM/PIZZAROTTI)

- Responsible for the budget, time limit and quality of the project.

- Coordination of all work packages (WPs) to optimise the QCD performance of the project.

- Contribution to the improvement of the gross margin of the project.

- Multi-site and multidisciplinary ressource management.

- Cost, risk and savings management.

- Additional clause negotiation and claims management with the client.

Railways
2009 - 2011

Off-shore project manager for the signaling lot of MARMARAY project in Istanbul : responsible of the Quality, Cost an Delay.

Marmaray project is a metro line in Istanbul of 76km going under the Bosphorus. This is the first signaling project mixing ERTMS + CBTC system.

Railways
2007 - 2009

Technical coordination and management for the signalisation of MARMARAY Project in Istanbul Turkey.

Deputy of on-shore project manager of Marmaray project. Coordination of activities and communication with consortium partnes, other contractors (civil works, rolling stock) and customer.

MARMARAY project is a metro project of 76km with 47 stations crossing the Bosphorus.;

I lived in Istanbul from august 2007 to december 2009.

Railways
2005 - 2007

Responsible of quality, cost and delay for design, development, installation, test and commissioning of Madrid Light Metro (Citadis).

I was based in France and managed teams in France, Brasil and Spain.

Railways
2002 - 2007

Responsible of quality, cost and delay for design, development, installation, test and commissioning of Incheon Metro (frist phase, from Incheon Airport to Gimpo Airport in Seoul).

I was based in France and managed teams in France, Brasil and Seoul.

Railways
2001 - 2001

Internship during 6 months in Freemont near San Francisco

Electronics and microelectronics

Charities, NGOs and Associations
Education
Hobbies
Salsa , danse , scuba diving , books , theater , cooking

Visitors to this profile also viewed these profiles
Patrice CAYLA
CONSULTANT INDEPENDANT - INGENIERIE D'EXPLOITATION FERROVIAIRE
Pierre D'Hommée
Directeurs des operations, Alstom Transport
Issam FARISSI
Responsable Essais CBTC/Signalisation et Courants faibles - SIEMENS
Stéphane Réveillé
Ingénieur Études et Développement Grands Logiciels Systèmes, Thales
Gregoire RENIE
Project Director, ALSTOM Transport
Alban Rampon
Connected Community Specialist, ARM
Philippe Leroy
Directeur insa entreprises, Insa de Strasbourg- groupe insa
David Ross
Urbaniste, OUQ, PMP
Thierry Jeanneret
Directeur, Groupe Gilbert
Aline Hercule
Serveuse, skys the limit