MICHEL FERNANDEZ
Gas Turbine (GT) Coordinator, CEGELEC
I am an experienced Field Service Engineer who is especially skilled in the installation, commissioning, repair, and support of gas and steam turbines, engines, and pneumatic and hydraulic production equipment. I have more than 30 years of international experience in maintenance and maintenance management. Now I would like to bring my extensive expertise and knowledge to work for your company.
My ability to oversee and carry out complex and demanding maintenance and repairs, together with my skills in training and supervising mechanics, has led to my successful career in my chosen field. I have performed and directed a wide variety of activities, including turbine assembly and disassembly, installation, commissioning, repair, and maintenance. I’m able to overhaul and improve turbines and engines, and I’ve been recognized throughout my career for my ability to dramatically reduce maintenance costs through effective periodic maintenance, repair, and enhancement. In addition, I’m especially skilled at troubleshooting and resolving complex issues.
I possess outstanding business and management abilities, and am adept at determining specifications, preparing strategic plans, and formulating maintenance policies and procedures. As a Mechanical Supervisor and Work Shop Manager, I’ve been responsible for increasing sales and profitability, negotiating purchase of parts, and coordinating inventory control functions.
2009 - 2011• Performed maintenance of all gas turbine equipment on offshore Oil & Gas Production Plant. Block 17 Offshore GIRASSOL
• Equipment : GE Frame 5 Mark V logic and Siemens SGT400 RS logic 5000.
• Coordinated with GE and Siemens Technicians regarding major mechanical breakage on turbines.
• Maintained 5 GE Frame 5 gas turbines (3 power generation; 2 Low & medium & high pressure compressors and 2 Siemens Cyclone for water injection).
• Performed troubleshooting and identified / resolved a major combustion issue for five GE Frames 5 Gas Turbines and 2 Siemens Cyclones gas turbines
• Designed and implemented maintenance policies and procedures to enhance efficiency.
2008 - 2009• Undertook major overhauls of gas turbine installed rotors on GE Frame 5 Gas Turbines.
• Supervised a local crew throughout the process on offshore Oil Production COB F1 Block 3 (Angola).
• Supervised a local crew in Franco Tosi (Italy) and carried out major assembly of steam turbine.
• Installed steam nozzles, rotor, all stator and rotor bladings and ensured accurate rotor alignment.
2005 - 2008• Responsible for maintenance of mechanical equipment on offshore Oil & Gas Production Plant.
• Performed daily / weekly / monthly preventive maintenance and troubleshooting of all equipment.
• Trained and oversaw 30 local Mechanics, assigning daily tasks, setting schedules, evaluating performance.
• Maintained 5 Rolls Royce RB211 gas turbines (3 power generation; 2 medium & high pressure compressors.
• Coordinated with Rolls Royce Technicians regarding major mechanical breakage on turbines.
• Monitored spare parts inventory and purchased parts to ensure proper inventory at all times.
• Designed and implemented maintenance policies and procedures to enhance efficiency.
• Carried out and supervised repairs to pumps, compressors, and diesel engines.
2003 - 2005Carried out major overhauls of gas turbine GE Frame 5 and start-up diesel engines.
• Removed, balanced and re-installed rotors, supervising a local crew throughout the process.
• Performed troubleshooting and identified / resolved a major combustion issue for three GE Gas Turbines
• Supervised a team of 15 on the repair and sale of pumps, motors, engines and spare parts.
• Coordinated logistics for receiving department and managed spare parts inventory.
• Prepared and delivered repair and replacement cost quotations for customers.
• Negotiated prices with customers and vendors to maximise profitability.
► Produced more than $750,000 in annual revenue – more than double the previous Manager.
► Increased profit growth from below zero to 36% in first year and 42% in second year.
► Major customers included : Total, Schlumberger, Friedlander, Foramer, Chevron and Exxon.