Arnaud Malenfer
Ingenieur Industrialisation / Project Manager - Manufacturing
N'hesitez pas a me contacter!
16 contactsCreation de dessin technique pour Piscine et couverture de Piscine
- Revue des bons de commande
- Creation des plans et realisation des dossiers de fabrication
- Relation avec client en Anglais et Francais (resolution de problemes techniques,...)
Swimming pool and pool cover design:
- Reviewing of purchase orders according to technical constraints
- Creation of specification drawings and manufacturing files
- Dealing with English and French speaking customers
2007 - 2010Fabricant de Veranda Aluminum et Bois
Responsable de l'industrialisation et de la maintenance de 3 differents ateliers, Fabrication Bois, Fabrication Aluminum et assemblage.
- Dernier project avec un budget d'environ 1,000,000 d'euros: Analyse, develloppement et installation d'une ligne de finition (production) et ligne de peinture.
- developpement du systeme de management de la qualite, encardre un technicien ainsi que differents stagiaires
- Mise au point d'une nouvelle machine de decoupe de profile aluminum travaillant sur plusieurs axes
- Amelioration du produit en respect des couts de production et des objectifs qualites
Manufacturer of wood and aluminum sunrooms
Responsible for industrialization and maintenance of 3 different workshops (wood manufacturing, aluminum manufacturing, and assembly)
- Last project with a budget of about CDN$1,500,000: analyzed, developed, and installed a wood finishing and painting line.
- Developed the quality management system, and managed a technician and various trainees
- Managed preventive and curative maintenance team: 2 technicians and trainees.
- Designed and built a new aluminum profile automatic cutting machine that can perform a several axis cut.
- Organized assembly production line and its supply chain.
- Improved product in accordance with production cost, industrialization, and quality objective.
2003 - 2006- Développement de machines spéciales
- Mise en place d'une nouvelle ligne de production
- Fiabilisation de la production
- Amélioration des postes de travail
- Mission en roumanie pour démarrage de lignes de production
...